{"id":826,"date":"2025-06-24T08:58:46","date_gmt":"2025-06-24T08:58:46","guid":{"rendered":"https:\/\/kldwinch.com\/?p=826"},"modified":"2026-10-15T01:26:04","modified_gmt":"2026-10-15T01:26:04","slug":"cabrestante-electrico-de-doble-tambor-para-trabajo-pesado","status":"publish","type":"post","link":"https:\/\/kldwinch.com\/es\/heavy-duty-double-drum-electric-winch\/","title":{"rendered":"Modular Double Rope Synchronous Industrial Winch 2T SEW K Geared Motor | KLD"},"content":{"rendered":"<p class=\"wp-block-paragraph\">A modular double-rope synchronous industrial winch. Two winch units are combined in one frame so both ropes pay out in sync, which saves installation space where the site is tight. K-series geared motor drive, grooved drum with a press roller to keep the rope in the groove, a mechanical height limit switch and an electromagnetic brake. Case configuration: 2T load, rope \u00d813 mm, 4 kW motor with VFD.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Especificaciones r\u00e1pidas<\/h2>\n\n\n\n<pre class=\"wp-block-code\"><code>Model: 2T  |  Load: 2T  |  Steel wire rope: \u00d813 mm\nRope length: upper 20 m \/ lower 36 m  |  Motor power: 4 kW (with VFD)\nDrum speed: 15 r\/min  |  Rope speed: 30 m\/min  |  Output torque: 2414 N\u00b7m<\/code><\/pre>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Escenarios de aplicaci\u00f3n y l\u00edmites aplicables<\/strong><\/h2>\n\n\n\n<pre class=\"wp-block-code\"><code>- Sites where two lifting points must move in sync \u2014 two winch units combined in one frame pay out both ropes together.\n- Space-constrained installations \u2014 combining two units in one frame reduces the footprint compared with two separate winches.\n- Lifting long or wide loads \u2014 the upper and lower drums carry different rope lengths (upper 20 m \/ lower 36 m), which suits asymmetric lift geometry.\n- Installations needing settable travel limits \u2014 the mechanical height limit switch allows the payout \/ take-up positions to be set on site.\n- Stopping and holding duty \u2014 the electromagnetic brake responds when the drive stops.\n\nBoundary: the case configuration is 2T load, rope \u00d813 mm, rope length upper 20 m \/ lower 36 m, motor 4 kW with VFD, drum speed 15 r\/min, rope speed 30 m\/min, output torque 2414 N\u00b7m, outline 1218 \u00d7 1297 \u00d7 1116 mm. This is a reference configuration. Before ordering, confirm: required load, whether the stated 2T is per unit or for the combined assembly, rope speed, rope diameter and the two rope lengths, drum grooving, duty classification, power supply, control mode and synchronisation accuracy requirement.<\/code><\/pre>\n\n\n\n<h2 class=\"wp-block-heading\">Caracter\u00edsticas Beneficios<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">K-series geared motor drive \u2014 provides stable power output for sustained duty and helps keep running smooth and efficient.<br>Grooved drum with press roller \u2014 the drum is grooved and a press roller holds the rope down, which helps prevent the rope from cross-winding or riding out of the groove and supports an even, orderly lay.<br>Modular design \u2014 two winch units are combined within one frame, so both ropes pay out in sync. This saves installation space and improves working efficiency.<br>Mechanical height limit switch \u2014 the upper and lower limits can be set to suit the application, which helps keep the winch within its working range and reduces the risk of over-travel.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Especificaciones t\u00e9cnicas completas<\/h2>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"425\" src=\"https:\/\/kldwinch.com\/wp-content\/uploads\/2025\/06\/\u4e8c\u7ef4\u56fe-14-1024x425.jpg\" alt=\"\" class=\"wp-image-1351\" title=\"\" srcset=\"https:\/\/kldwinch.com\/wp-content\/uploads\/2025\/06\/\u4e8c\u7ef4\u56fe-14-1024x425.jpg 1024w, https:\/\/kldwinch.com\/wp-content\/uploads\/2025\/06\/\u4e8c\u7ef4\u56fe-14-300x124.jpg 300w, https:\/\/kldwinch.com\/wp-content\/uploads\/2025\/06\/\u4e8c\u7ef4\u56fe-14-768x319.jpg 768w, https:\/\/kldwinch.com\/wp-content\/uploads\/2025\/06\/\u4e8c\u7ef4\u56fe-14-1536x637.jpg 1536w, https:\/\/kldwinch.com\/wp-content\/uploads\/2025\/06\/\u4e8c\u7ef4\u56fe-14.jpg 1588w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>Modelo: 2T<\/td><td>Carga: 2T<\/td><td>Di\u00e1metro del cable de acero: 13 mm<\/td><td>Longitud de la cuerda: subida 20 m, bajada 36 m<\/td><\/tr><tr><td>Potencia del motor (con conversi\u00f3n de frecuencia): 4KW<\/td><td>Velocidad de rotaci\u00f3n del tambor: 15 r\/min<\/td><td>Velocidad de la cuerda: 30 m\/min<\/td><td>Par de salida: 2414 Nm<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>Modelo: 2T<\/td><td>A (Longitud): 1218 mm<\/td><td>B(Ancho): 1297 mm<\/td><td>C(Altura): 1116 mm<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Tama\u00f1o Instalaci\u00f3n e interfaz del sistema<\/h2>\n\n\n\n<pre class=\"wp-block-code\"><code>Outline (case 2T): A 1218 \u00d7 B 1297 \u00d7 C 1116 mm.\nLayout: two winch units combined in one frame \u2014 upper drum and lower drum, each with its own geared motor; the units are linked by connecting rods so both ropes pay out together.\nRope lengths: upper drum 20 m, lower drum 36 m (different lengths suit the lift geometry \u2014 confirm against your rigging layout).\nDrum: grooved drum with a press roller to hold the rope in the groove.\nLimit switch: mechanical height limit switch; payout \/ take-up positions are settable on site.\nElectrical: 4 kW motor with VFD; confirm supply voltage, phase, frequency, VFD model, control mode and synchronisation signal requirement between the two units.\nBrake: electromagnetic brake; confirm required brake torque and holding duty.\nMounting: confirm the mounting interface, bolt sizes, base detail and the synchronisation accuracy requirement on the approved drawing.<\/code><\/pre>\n\n\n\n<h2 class=\"wp-block-heading\">Control, seguridad y protecci\u00f3n<\/h2>\n\n\n\n<pre class=\"wp-block-code\"><code>- Brake: electromagnetic brake \u2014 responds when the drive stops, which helps reduce the risk of load drift.\n- Travel limit: mechanical height limit switch with settable payout \/ take-up positions \u2014 helps keep the winch within its working range.\n- Rope control: grooved drum with press roller \u2014 helps prevent cross-winding and helps keep the rope in the groove.\n- Synchronisation: the two units are combined in one frame so both ropes pay out together; confirm the required synchronisation accuracy and how it is monitored.\n- Drive: 4 kW motor with VFD \u2014 speed control via the VFD.\n- Recommended to confirm: duty classification, brake torque and holding requirement, upper\/lower limit switches, slack-rope detection, overspeed protection, emergency stop, and the electrical protection and earthing for the site.\n- Optional: drum divider flange, manual emergency crank, VFD control panel, pulley, encoder with main-shaft limit switch, pendant remote control, limit switch, rope follower, winding device, grooved drum, slack-rope switch, slip ring, class certificates (LRS \/ BV \/ ABS \/ DNV GL).<\/code><\/pre>\n\n\n\n<h2 class=\"wp-block-heading\">Opciones de personalizaci\u00f3n y proceso de ingenier\u00eda<\/h2>\n\n\n\n<pre class=\"wp-block-code\"><code>Configured around your operating conditions \u2014 Share the required lifting load, rope travel and diameter, operating speed, duty cycle, power supply, installation envelope and environment. KLD will review the application and provide a proposed configuration, technical drawing and quotation for approval.\nRequirements \u2192 Concept \u2192 Drawing &amp; Quotation \u2192 Approval \u2192 Production &amp; Test \u2192 Delivery<\/code><\/pre>\n\n\n\n<h2 class=\"wp-block-heading\">Normas, pruebas y calidad<\/h2>\n\n\n\n<pre class=\"wp-block-code\"><code>The company operates an ISO 9001 quality management system. CE conformity documents (LVD, EMC) are available for applicable configurations on request.\n\nFactory testing follows the approved technical specification for each configured unit and may include: no-load run, rated-load operation, twin-rope synchronization check, limit function and control verification. Available documentation may include dimensional drawings, electrical diagrams, inspection records and functional test results, depending on project scope.<\/code><\/pre>\n\n\n\n<h2 class=\"wp-block-heading\">Casos de ingenier\u00eda<\/h2>\n\n\n\n<pre class=\"wp-block-code\"><code>an industrial site needed two lifting points to move in sync, but the available installation space did not allow two separate winches side by side.\n\nSolution: modular double-rope synchronous industrial winch, case model 2T \u2014 two winch units combined in one frame with upper and lower drums (rope lengths 20 m and 36 m), K-series geared motor drive, grooved drum with press roller, mechanical height limit switch with settable positions, electromagnetic brake, 4 kW motor with VFD. Load 2T, rope \u00d813 mm, drum speed 15 r\/min, rope speed 30 m\/min, output torque 2414 N\u00b7m. Outline 1218 \u00d7 1297 \u00d7 1116 mm.\n\nOutcome: the combined frame reduced the footprint while both ropes paid out together, and the installation passed acceptance.<\/code><\/pre>\n\n\n\n<h2 class=\"wp-block-heading\">Descarga de datos t\u00e9cnicos<\/h2>\n\n\n\n<pre class=\"wp-block-code\"><code>Descargas: - Ficha t\u00e9cnica del producto (PDF) - Plano de disposici\u00f3n general (PDF) - Manual de instalaci\u00f3n y funcionamiento (PDF) - Solicitar plano CAD\/el\u00e9ctrico<\/code><\/pre>\n\n\n\n<h2 class=\"wp-block-heading\">Embalaje de entrega y soporte del ciclo de vida<\/h2>\n\n\n\n<pre class=\"wp-block-code\"><code>La mayor\u00eda de los cabrestantes se fabrican a medida; el plazo de entrega se confirma tras la aprobaci\u00f3n t\u00e9cnica y la revisi\u00f3n del pedido. El soporte del proyecto puede incluir la revisi\u00f3n de la configuraci\u00f3n, la aprobaci\u00f3n de los planos, las pruebas en f\u00e1brica, el embalaje para exportaci\u00f3n, la asistencia para la puesta en marcha remota y la recomendaci\u00f3n de repuestos. Se ofrece asistencia para la medici\u00f3n e instalaci\u00f3n in situ en los proyectos que lo requieran.<\/code><\/pre>","protected":false},"excerpt":{"rendered":"<p>A modular double-rope synchronous industrial winch. Two winch units are combined in one frame so both ropes pay out in sync, which saves installation space where the site is tight. K-series geared motor drive, grooved drum with a press roller to keep the rope in the groove, a mechanical height limit switch and an electromagnetic [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":830,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2,50],"tags":[],"class_list":["post-826","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-products","category-double-drum-winch"],"_links":{"self":[{"href":"https:\/\/kldwinch.com\/es\/wp-json\/wp\/v2\/posts\/826","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/kldwinch.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/kldwinch.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/kldwinch.com\/es\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/kldwinch.com\/es\/wp-json\/wp\/v2\/comments?post=826"}],"version-history":[{"count":6,"href":"https:\/\/kldwinch.com\/es\/wp-json\/wp\/v2\/posts\/826\/revisions"}],"predecessor-version":[{"id":8063,"href":"https:\/\/kldwinch.com\/es\/wp-json\/wp\/v2\/posts\/826\/revisions\/8063"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/kldwinch.com\/es\/wp-json\/wp\/v2\/media\/830"}],"wp:attachment":[{"href":"https:\/\/kldwinch.com\/es\/wp-json\/wp\/v2\/media?parent=826"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/kldwinch.com\/es\/wp-json\/wp\/v2\/categories?post=826"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/kldwinch.com\/es\/wp-json\/wp\/v2\/tags?post=826"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}